Metal Deck Roll Forming Machine
Model NO.: YX75-187.5-750
Forging Forming Method: Roll Forming
Export Markets: Global
Type: Roll Forming Machinery
Method: Roll Forming
Processing: Roll Forming
Product: Metal Deck
Brick Raw Material: Metal
Automation: Automatic
Trademark: SAIBO
Transport Package: Sea Packing
Specification: CE SGS
Origin: Suzhou, China
HS Code: 8455221000
Metal Deck Roll Forming Machine
1. Profile drawing:
2. The Chart of Process Flow
3. Main Specification
| Item NO | Description |
Offered specification |
| Roll Forming Machine | YX75-187.5-750 | |
| Rolling Speed |
12-15m/min(not include cutting time) |
|
| Rolling Thickness | 0.8-1.5mm | |
| Control System | PLC (Panasonic) as list in the note | |
| Un Coiler | 5 ton manual de-coiler | |
| Roller Stations | About 36 stations | |
| Roller Material | 45# forge steel, coated with chrome | |
| Shaft Material and DIA |
¢85mm, material is 45# forge steel |
|
| Maim Motor Power | 22kw (two 11KW) | |
| Hydraulic Station Power | 7.5kw | |
| Hydraulic Pressure | 12Mpa | |
| Material Of Cutting |
Cr12Mov quenching 58-62ºC |
|
| Material Of The Stations | Cast iron | |
| Tolerance | 3m+-1.5mm | |
| Electric Source |
380V, 50HZ,3 phase |
|
| Way Of Drive | 1.2 inch double chain | |
| Color Of The Machine | Yellow and blue | |
| Size of the machine | L*W*H around 16m*1.7m*1.6m | |
| Container Need | 2 x40 feet |
4. Packing & Delivery
Deliver time: take goods after receive deposit 60 days
Packing: suitable of ocean transportation
5. Warranty
Warranty: 1 year warranty from date of shipment
Guarantee:
1: Guaranteed against malfunctions due to manufacturing defects for 1 year after date of shipment. Repairs will be made free of charge.
2: Repairs will not be performed free of change even during the guarantee period in the follow circumstances
- Damage occurs due to a natural disaster
- Malfunction occurs due to user error
- Malfunction occurs due to modifications
- Malfunction occurs due to further movement or shipment after installation
3:Air ticket, transportation غير مجاز مي باشدt, hotel, meals and 100$ per day shall be for purchaser's account if manufacturer's engineer has to be send to purchaser's factory to maintain the machine during the guarantee period.
6. Payment Term
30% deposit by T/T in advance and 70% balance after inspection confirmation before shipment
ATTENTION: The profile of the panel is according to the clients!
Vulcanization Furnace,Rubber Equipment Insulation Pipe Extrusion Machine,Hot Air Vulcanization Oven,Rubber Curing Machine Extrusion Line
Guangzhou Casselin Trading Co., Ltd. , https://www.casselinautoparts.com
برچسب: ،