Precautions for running-in period of concrete pipe machine
1. Reasonable selection of lubricating oil, especially for motors with input power greater than 11 KW. The cement pipe machine pays attention to checking the lubricating oil, hydraulic oil, coolant, oil level and quality frequently, and pay attention to checking the tightness of the whole machine. The lack of excess oil in the inspection should be analyzed. At the same time, the lubrication of each lubrication point should be strengthened. It is recommended that lubrication points be greased weekly (except for special requirements) during the running-in period. When the speed reducer with oil pump is connected to the power supply, pay attention to the rotation direction of the oil pump and rotate clockwise to correct.
2. The end of the run-in period, the compulsory maintenance of the cement pipe-making machine, the inspection and adjustment of the cement pipe-making machine, and the attention to the replacement of the oil
Plate flange is easy to obtain materials, easy to manufacture, low غير مجاز مي باشدt and widely used; however, its rigidity is poor, so it should not be used in chemical process piping system with requirements of supply and demand, inflammable, explosive and high vacuum degree, and occasions with high and extreme hazards. The sealing surface type has plane and protruding surface.
Plate Flange Raised Face,Plate Flange Flat Face,Plate Flat Flange,Forged Flange
Jinan Xintai Forging Co., Ltd , https://www.xtdzflange.com
برچسب: ،